Scope of work
: Modifying MDB cabinet for addition new breaker 400A
: Making and Installing new DB panel 400A
: Laying new cable Tray (Galvanized)200x200x100 with cover
: Pulling new power cable 2x(1 x 95 Sqmm),50%N,25%E
Due date : (25/9-14/11/2016)
Location : Bangkla pattana (CP group) Chachoengsao Province.
Client : Sahachon engineering.
Working team : Phopprom & MTC engineering.
 |
| Pipe rack cross over head for pulling new cable to new room. |
 |
| Stream Boiler Room |
 |
| Power cable CV 1 x 95 Sqmm. |
 |
| Galvanized cable tray |
 |
| MDB Room |
 |
| Adding new breaker 400A |
 |
| After modify MDB cabinet |
 |
| Electrical room |
 |
| Install cable tray |
 |
| Pulling new Power Cabl |
 |
| New DB panel |
 |
| Cable tray line |
Install Temperature monitoring and timer control hot water tank.
Scope of work
: Install control boxes (Temperature indicator and Timer controller)
: Temperature monitoring and sounding and lighting when timer on
Due date : 14/11/2016
Location : Bankla pattana (CP group) Chachoengsao Province.
Working team : Phopprom
 |
| Hot water tank room |
 |
| Wiring preparation work |
 |
| Instaling control boxes |
 |
| Control hot water three tank. |