Scope of work

           : Modifying MDB cabinet for addition new breaker 400A
           : Making and Installing new DB panel 400A
           : Laying new cable Tray (Galvanized)200x200x100 with cover 
           : Pulling new power cable 2x(1 x 95 Sqmm),50%N,25%E

Due date : (25/9-14/11/2016)
Location : Bangkla pattana (CP group)  Chachoengsao Province.
Client     : Sahachon engineering.
Working team : Phopprom & MTC engineering.



Pipe rack cross over head for pulling new cable to new room.


Stream Boiler Room



Power cable CV 1 x 95 Sqmm.







Galvanized cable tray

MDB Room




Adding new breaker 400A
After modify MDB cabinet

Electrical room



Install cable tray


 Pulling new Power Cabl
New DB panel






Cable tray line


Install Temperature monitoring and timer control hot water tank.
Scope of work

           : Install control boxes (Temperature indicator and Timer controller)
           : Temperature monitoring and sounding and lighting when timer on
          
Due date : 14/11/2016
Location : Bankla pattana (CP group)  Chachoengsao Province.
Working team : Phopprom 
Hot water tank room

Wiring preparation work



Instaling control boxes



Control hot water three tank.



ไม่มีความคิดเห็น:

แสดงความคิดเห็น

์นิวโมเดล spot welding robot

รับงาน ติดตั้งปรับปรุงเครื่องจักร ระบบไฟฟ้าโรงงาน Robots ,Machines ,Utility System   เพิ่ม นิวโมเดล Jig Spot Welding ระบบอินเตอร์เฟส โรบ...

Company reference

Company reference

Company co-operate

Company co-operate

ค้นหาบล็อกนี้