Scope of work
: Modifying MDB cabinet for addition new breaker 400A
: Making and Installing new DB panel 400A
: Laying new cable Tray (Galvanized)200x200x100 with cover
: Pulling new power cable 2x(1 x 95 Sqmm),50%N,25%E
Due date : (25/9-14/11/2016)
Location : Bangkla pattana (CP group) Chachoengsao Province.
Client : Sahachon engineering.
Working team : Phopprom & MTC engineering.
 |
Pipe rack cross over head for pulling new cable to new room. |
 |
Stream Boiler Room |
 |
Power cable CV 1 x 95 Sqmm. |
 |
Galvanized cable tray |
 |
MDB Room |
 |
Adding new breaker 400A |
 |
After modify MDB cabinet |
 |
Electrical room |
 |
Install cable tray |
 |
Pulling new Power Cabl |
 |
New DB panel |
 |
Cable tray line |
Install Temperature monitoring and timer control hot water tank.
Scope of work
: Install control boxes (Temperature indicator and Timer controller)
: Temperature monitoring and sounding and lighting when timer on
Due date : 14/11/2016
Location : Bankla pattana (CP group) Chachoengsao Province.
Working team : Phopprom
 |
Hot water tank room |
 |
Wiring preparation work |
 |
Instaling control boxes |
 |
Control hot water three tank. |