Main Electrical power work
Modify MDB panel to addition main breaker and install load centre,
: Pulling new power cable and new Loader centre.
: Addition new breaker 250AF/AT 3P.
Location : Bangkla pattana Co,.Ltd ( CP Group) chachoengsao province.
 |
Modify MDB cabinet to addition new breaker |
 |
Front panel MDB cabinet |
 |
New breaker 250AF/AT 3P |
 |
Install new power cable to loader centre 100A |
 |
New load centre 100A |
Change main power cable from laid under earth type to cross over head
: Old system laid under earth had power leaked to Ground and phase.
: Use power rack spoon insulator cross over head type
 |
95 Sqmm. NYY power cable |
 |
Providing power cable for pulling |
 |
Cross over head |
 |
Add new breaker |
 |
Fabricating new galvanized pole support power rack |
 |
Pulling new power cable NYY 95Sqmm. |
 |
Cross over head type |
 |
over head free air |
Machine modify to safety project
Location :Faurecia emission control Eastern seaboard rayong
 |
Addition light curtain safety and PLC modify program. |
 |
pipe bending machine |